Important Tips for Good Construction Practices at Site

Important Tips for Good Construction 

Practices at Site

Important Tips for Good Construction Practices at Site

1. Check the reinforcement, electrical layouts etc. before concreting. 

2. Ensure that shuttering and scaffolding is firm and proper so that it can withstand pumping 
load and load of man and material movement on slab. 

3. Seal all joints in formwork with tape or aluminum foil or putty of used grease and cement 
(50:50) in order to avoid slurry leakage at the time of casting. 

4. Check that vibrator is in working condition, and adequate labour is available
5. Ensure sufficient light arrangements in case of late evening concreting. 

6. Clear the site of unwanted material and keep enough space for pump placement and Transit 
Mixer Movement. 

7. Permission from concerned traffic police authorities to be taken to avoid last minute hassles. 

8. Maintain proper cover to reinforcement and ensure that concrete cover blocks are not 
distributed during concreting. 

9. The concrete should be placed as fast as possible, but not faster that the rate of compaction. 

10. Do not add water to concrete at the time of pumping as it may deteriorate the quality of the 
concrete. 

11. Ensure adequate compaction of concrete by pin / pan vibrators. Fully compacted concrete is 
dense, strong, durable and impermeable. 

12. Avoid over compaction of slab as it may lead to bleeding of concrete and shrinkage cracks. 

13. The curing of concrete must be done religiously in order to replenish the loss of water from 
the concrete surface on account of absorption and evaporation, thus maintaining sufficient 
water for cement paste to hydrate and gain strength. Moist curing must be started within 3-5 
hours of placement of concrete depending on the environment temperature or slab must be 
covered by gunny bags to prevent loss of water. 

14. Early curing help in reducing the plastic shrinkage cracks that occur due to loss of water from the concrete surface. 

15. In case of rain, cover the slab with tarpaulin sheets to prevent washing off of slab or dilution 
of concrete quality due to excess water. 

16. Incase of high winds and hot temperature, cover the slab with tarpaulin, gunny bags etc to 
prevent loss of moisture from the slab. 

17. Do not allow the drastic drying of green concrete to avoid plastic shrinkage cracks.