RCC Residential Building Brief Specifications
RCC
Residential Building Brief Specifications
Brief Specifications:
1. Plastered brickwork as per
plan with lintels and sunshades using box chamber bricks
2. Room
height 10’0” finish to finish
3. Open
excavation footings (based on soil test) upto 5'0" from existing ground
level
4. RCC
structure designed as per Indian Standard with M20 concrete and Fe415/500 steel
5. Cement –
Penna/Coromondal/Ramco; Steel – Vicky/Suryadev/Sujana/ARS
6. Basement
height 2’6” with brickwork
7. Basement
fill using good quality earth and quarry dust levelling, PCC blinding, cement
finish
8. Two coat putty, two primer and two
coats ordinary emulsion paint on internal walls; one primer and two OBD on
ceiling; one primer and two external emulsion on external surfaces
9. Tiles for floor area – Vitrified
tiles basic price Rs. 42/-; Toilets and kitchen tiles (7’0” Dado) – Ceramic
tiles basic price Rs. 25/-
10. Carpentry work with front teak
wood door, flush/moulded doors for internal, toilet doors PVC, glazed
country-wood windows
11. Plumbing lines UPVC/CPVC. [One
toilet for 400 sft]. Plumbing fixtures (washbasins, water closets etc) excluded
12. Electrical wires FRLC Finolex,
Switches Anchor, Distribution board, switch boards included. Electrical
fittings (lights, fans, generators, motors etc excluded)
Approximate rate per sft for above specifications
for building size 25,000 sft : Rs. 1260/- for floor area; Rs. 900/- for stilt
area
Approximate rate per sft for above specifications
for building size 6,000 sft : Rs. 1400/- for floor area; Rs. 990/- for stilt
area
[Exclusive of taxes]
Change of specifications:
1. Designed
for additional floor (add Rs. 70/-)
2. Increase/decrease
room height (add/deduct Rs. 50/- per feet)
3. Steel
from SAIL, Tata or Vizag (add Rs. 40/-)
4. Wire-cut
bricks (add Rs. 25/-)
5. Pile
foundations / deeper foundation depends on soil test
Items not in scope:
1. Power
and water at site
2. Approval
and public expenses
3. External
land-fill, sump, septic tank, weathering course
4. Compound
walls, gates, internal roads
5. Electrical
and plumbing fitings
6. Air
handling, MEP, HVAC and all other service installations
7. All
process installations for industries
8. External
elevation works
Terms of payment:
All periodic stages 67% against materials purchased
on bill, 33% on labour and other items.