Sequence of earth works
Sequence of earth works
Materials and Tools
Used:
The
following are the materials used for the earthwork for foundation.
1. Spade,
2. Kassi,
3. Pick Axe,
4. Crow Bar,
5. Rammer,
6. Wedge,
7. Boning Rod,
8. Sledge Hammer,
9. Basket,
10.
Iron Pan,
11.
Line and Pins
Drawings Required
1.
Centerline Drawing
2.
Layout Plan
Size
of Foundation
a.
For Main Walls 4’0” Depth
b.
For Partition Walls 2’0” Depth
Scope of the work:
·
Setting
out of corner benchmarks.
·
Survey
for ground levels.
·
Survey
for top levels
·
Excavation
to approved depth.
·
Dressing
of loose soil.
·
Making
up to cut off level
·
Constructing
dewatering wells and interconnecting trenches.
·
Marking
boundaries of the building.
·
Constructing
protection bunds and drains
Working Procedure
The extent of soil and rock strata is
found by making trial pits in the construction
site. The excavation and depth is decided according to the following
guidelines in the site
i.
For Isolated footing the depth to be one and half times the width of the
foundation - 44 -
ii.
For adjacent footings with clear spacing less than twice the width (i.e.) one
and half times the length
iii.
1.5m in general and 3.5 m in black cotton soils
In this site open foundation pits for columns and trenches for CR
Masonry was carried out. The maximum
depth was upto 3m. Setting out or ground
tracing is the process of laying down the excavation lines and center lines etc. on the ground before the
excavation is started. The center line of the
longest outer wall of the building is marked on the ground by stretching
a string between wooden or mild steel
pegs. Each peg may be projected about 25 to 50 mm form the ground level and 2m from the edge of the
excavation. The boundary is marked with the
lime powder. The center lines of other walls are marked perpendicular to
the longer walls. A right angle can be
formed by forming 3, 4 and 5 triangles. Similarly, outer lines of the foundation trench of each cross walls
and are set out
Removal of Excess
Soil
·
Estimate the excavated stuff to be re-utilized in filling, gardening, preparing
roads, etc.As far as possible try to carry excavation and filling simultaneously
to avoid double handling. Select and
stack the required material in such a place that it should not obstruct other construction activities. The excess or
unwanted material should immediately be carried
away and disposed off by employing any of the following methods.
·
Departmental
labour.
·
Tractor.
·
Trucks.
QUALITY CHECKS FOR
EXCAVATION
·
Recording
initial ground level and check size of bottom.
·
Disposal
of unsuitable material for filling.
·
Stacking
suitable material for backfilling to avoid double handling.
·
Strata
classification approval by competent authority.
·
Dressing
bottom and sides of pits as per drawing with respect to centerline.
·
Necessary
safety measures observed.
QUALITY CHECKS FOR
FILLING
·
Recording
initial ground level
·
Sample
is approved for back filling.
·
Necessary
marking/ reference points are established for final level of backfilling.
·
Back
filling is being carried out in layers (15cm to 20cm).
·
Required
watering, compaction is done. Required density is achieved.
Brick work
Working
Procedure All the bricks to use in construction are soaked well in water so
that they don’t absorb water from the mortar. Mortar is spread on the top of
the foundation course over an area to be
covered by the edges of the wall. The corner of the wall is constructed first.
The excess mortar from the sides will
squeeze out, which is cleaned off with trowel. The level and the alignment are checked. If the brick
is not in level, they are pressed gently further. After having laid the first course at the
corner, mortar is laid and spread over the first course and the end stretcher is laid first
and hammered it on the laid mortar. Perpends
must be kept vertical. This should be checked, as the work proceeds with
the help of straight edge and square.
After having constructed the wall, jointing and pointing is done.
PCC
Materials
and Tools used
·
Auto
level instrument – 1 Nos
·
Wooden
/Steel rammer – 1 Nos
·
Mixer
machine – 1 Nos
Scope of work
·
Verifying
levels and dimension
·
Ramming
the earth surface
·
Placing
the concrete.
·
Ramming
and finishing the concrete surface
Working Procedure
·
Excavation
levels and dimensions to be checked as per drawings. Remove all the loose earth from the pits. Do water
sprinkling and ramming the cleaned surface of
pit by mechanical rammer. Do the shuttering by planks and runners
wherever if necessary. Mix the concrete
with required proportion and water cement ratio by mechanical mixer machine and place the same
in to pits. Poured surface to be rammed
and finished smoothly