JOB EXECUTION PROCEDURE FOR TEST ON SOIL
NAME OF PROJECT:
CONTRACTOR:
|
JOB EXECUTION PROCEDURE FOR
TEST ON SOIL
|
DOC
NO:
QC-
|
||||||||
CONTRACT
NO:
|
REPORT
NO:
|
|||||||||
CONSULTANT:
GEL
|
DATE:
|
|||||||||
REPORT No.
|
Sample nos.
|
1
|
2
|
3
|
4
|
|||||
1
|
R.L.
of Filled / Compacted soil Layer
|
|
|
|
|
|||||
2
|
Layer
No.
|
|
|
|
|
|||||
3
|
Location
/ work area
|
|
|
|
|
|||||
4
|
Weight
of Core Cutter + wet soil
(WS
gms)
|
|
|
|
|
|||||
a)
|
Weight
of Core Cutter (WC gms)
|
|
|
|
|
|||||
b)
|
Weight
of Wet Soil (WS – WC gms)
|
|
|
|
|
|||||
c)
|
Volume
of Core Cutter (Vc cc)
|
|
|
|
|
|||||
d)
|
Bulk
Density Yb = (Ws – Wc) / Vc gms/cc.
|
|
|
|
|
|||||
5
|
Weight
of wet soil (W2 gms)
|
|
|
|
|
|||||
6
|
Weight
of dry soil (W3 gms)
|
|
|
|
|
|||||
7
|
Moisture
Content (w%) = (W2 – W3) / (W3) x 100
|
|
|
|
|
|||||
8
|
Dry
density
Yd
= (100xYb)/(100+w)gms/cc
|
|
|
|
|
|||||
9
|
Lab.
Max dry density in gms/cc
|
|
|
|
|
|||||
10
|
Optimum
moisture content in %
|
|
|
|
|
|||||
11
|
Percentage
of FDD
|
|
|
|
|
|||||
REMARKS
|
|
|
|
|
||||||
CONTRACTOR
|
CONSULTANT
|
CLIENT
|
||||||||
No comments
Post a Comment