JOB EXECUTION PROCEDURE FOR Reinforced Cement Concrete (POUR CARD – CONCRETING)

AGENCY/

CONTRACTOR

JOB EXECUTION PROCEDURE FOR Reinforced Cement Concrete
(POUR CARD – CONCRETING)
DOC NO:
QC-01
Contract No:
Report No:
Consultant GEL
Date:
Type / Grade of cement to be used
Batch No:
MTC available:
1
Type of Work/Structure/Location
2
Ref. Drawing No.
Rev. No.
3
Concrete Grade
Design Mix proportion
4
W / C Ratio:
Slump:
5
Grading of aggregates:
6
Cement Consumption, Actual :                         Theoretical:
7
MACHINERY USED:
A
Batching Plant / Mixer Machine:
B
Vibrators:
C
Concrete Pump:
D
Crane:
E
Hoist:
8
CHECK FOR STEEL, REINFORCEMENT & INSERTS IF ANY:
A
Lap length:
No. of Laps:
B
Sleeves/Pockets/Opening Provided:
C
Insert Plates Anchor Bolts:
D
Binding wire/gauge:
E
Chairs/Spacer bars provided (if any)
F
Cover Blocks provided
9
Compaction of concrete achieved
10
Dimensions of shuttering/Rigidity of  supports:
11
Admixture/Plasticizer used:

Brand/Type:
Consumption/Cum:
12
Time of concreting Start:
Finish:
13
Concrete Cube Nos:
Cube Mark:
REMARKS



(Contractor)


GEL
(Consultant)



(Client)