JOB EXECUTION PROCEDURE FOR PLASTERING
CONTRACTOR: |
JOB EXECUTION PROCEDURE FOR PLASTERING
|
DOC NO:QC - |
|||||
CONTRACT NO:
|
REPORT NO:
|
||||||
CONSULTANT: GEL
|
DATE:
|
||||||
Structure:
|
Ref. Drawing no:
|
||||||
Location:
|
Approx. quantity:
|
||||||
Type of Plastering:
|
Mortar Mix:
|
||||||
1
|
Before Plastering
|
||||||
a
|
Check for hacking:
|
||||||
b
|
Provision for chicken mesh:
|
||||||
c
|
Preparation of surface, remove
efflorescence:
|
||||||
d
|
Services/Fixtures, Doors/Windows:
|
||||||
e
|
Pre-wetting of surface:
|
||||||
f
|
Thickness of mortal pads:
|
||||||
2
|
During Plastering
|
||||||
a
|
Addition of water proofing compound:
|
||||||
b
|
Proper roughening of first coat:
|
||||||
c
|
Clearing of dead mortar:
|
||||||
d
|
Check for grooves/drip moulds:
|
||||||
3
|
After Plastering
|
||||||
a
|
Curing
|
||||||
b
|
Check for hollowness:
|
||||||
c
|
Check for surface texture:
|
||||||
Contractor
|
Consultant
|
Client
|
|||||
NAME
OF PROJECT: