CHECK LIST FOR QUALITY CONTROL OF RCC WORKS
CHECK LIST FOR QUALITY
CONTROL OF RCC WORKS
|
|
1.
|
Proper grading of aggregates as per mix design. Aggregates
should not be from disintegrated or soft rock. It should not contain dust,
earth & sand or any other foreign matter.
|
2.
|
Proper grading of sand as per mix design. Monitor silt content
and bulkage.
|
3.
|
Water for mixing and curing. Potable water should be used.
|
4.
|
Carry out slump test at regular intervals to ensure proper
workability.
|
5.
|
Carry out adequate number of cube tests at 7 & 28 days.
Calculate standard deviation & find out whether the cube results have
failed or passed as per IS:456-2000 guide lines.
|
6.
|
Make adequate number of cover blocks & chairs as per the
required clear cover of various members.
|
7.
|
Get reinforcement physical test certificate from
supplier/manufacturer.
|
8.
|
Ensure that binding wires are adequately used for tying up of
reinforcements.
|
9.
|
Check spacing/length of hooks and overlaps. Laps shall be
staggered.
|
10.
|
Check vertical & horizontal alignment & strength
of centering and shuttering.
|
11.
|
Ensure that thickness/width of section is adequate for
inserting vibrator, else inform the design office for possible revision.
|
12.
|
Ensure proper curing for required number of days. Use curing compound,
if member is not easily accessible.
|
13.
|
Check that expansion/construction joints are properly
made & at correct location as per the drawings.
|
14.
|
Check size, location & orientation of cutouts, inserts
& bolts.
|
15.
|
Make proper access/ walking arrangement over slab for proper
inspection & to avoid any damage to reinforcements.
|
16.
|
Check adequate availability of cement, aggregate, sand,
admixtures & water before commencing concreting.
|
17.
|
De-bonding compound to shuttering materials.
|