BUILDING PLANNING AND CONSTRUCTION MANAGEMENT Civil Engineering Question paper

II B.Tech II Semester Examinations,APRIL 2011

BUILDING PLANNING AND CONSTRUCTION MANAGEMENT
Civil Engineering

Time: 3 hours Max Marks: 80

Answer any FIVE Questions

All Questions carry equal marks

1. (a) De?ne and explain brie?y the following terms:
i. Height of building
ii. Service Road
iii. Building set back.


(b) Explain the objectives of building byelaws in large urban areas. [9+7]
2. Write short notes on any two of the following:
(a) Di?erent types of rollers used for compaction
(b) Stabilization of soils with cement
(c) Geotechnical materials. [16]


3. Design an village panchayat o?ce for the following requirements and draw a line
diagram.
(a) Entrance and waiting room - 15 sq.m.
(b) Meeting hall to accommodate 40 people - 40 sq.m.
(c) V.P. President Chambers with attached toilet - 18 sq.m.
(d) V.P Secretary Chambers with attached toilet - 15 sqm.
(e) O?ce for 10 sta? - 100 sq.m.
(f) Toilet blocks - 2 Nos. of suitable size.
(g) Necessary provision to be made for corridors. [16]


4. List the factors a?ecting the design of residential buildings and explain in detail
the following: orientation, function and site topography. [16]
5. What are the factors e?ecting the selection of a truck for any construction work.
[16]
6. For the given ?gure 5network, calculate
(a) Earliest and latest activity time for each activity
(b) Total ?oat, free ?oat and independent ?oat.
(c) Determine the critical path. [16]


7. For the network shown in ?gure 4, assume that after working 14 days on the project,
the following conditions exist:-
(a) Activities 1-2 and 1-3 are complete as originally planned.
(b) Activity 3-4 is in process and will need 16 more days for completion.
(c) Activity 4-5 appears to present some problem and its now estimated time of
completion is 10 days.
(d) Activity 4-6 can be completed in 5 days instead of the originally planned 7
days.
Update the network and compare the crictal paths for the old network and the
updated network and thus calculate the remaining duration of the project. [16]


8. What are the factors e?ecting the output of a Drag line. [16]


II B.Tech II Semester Examinations,APRIL 2011
BUILDING PLANNING AND CONSTRUCTION MANAGEMENT
Civil Engineering


Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks


1. List the factors a?ecting the design of residential buildings and explain in detail
the following: orientation, function and site topography. [16]


2. Write short notes on any two of the following:
(a) Di?erent types of rollers used for compaction
(b) Stabilization of soils with cement
(c) Geotechnical materials. [16]


3. For the given ?gure 5network, calculate
(a) Earliest and latest activity time for each activity
(b) Total ?oat, free ?oat and independent ?oat.
(c) Determine the critical path. [16]


4. Design an village panchayat o?ce for the following requirements and draw a line
diagram.
(a) Entrance and waiting room - 15 sq.m.
(b) Meeting hall to accommodate 40 people - 40 sq.m.
(c) V.P. President Chambers with attached toilet - 18 sq.m.
(d) V.P Secretary Chambers with attached toilet - 15 sqm.
(e) O?ce for 10 sta? - 100 sq.m.
(f) Toilet blocks - 2 Nos. of suitable size.
(g) Necessary provision to be made for corridors. [16]


5. What are the factors e?ecting the output of a Drag line. [16]


6. For the network shown in ?gure 4, assume that after working 14 days on the project,
the following conditions exist:-
(a) Activities 1-2 and 1-3 are complete as originally planned.
(b) Activity 3-4 is in process and will need 16 more days for completion.
(c) Activity 4-5 appears to present some problem and its now estimated time of
completion is 10 days.
(d) Activity 4-6 can be completed in 5 days instead of the originally planned 7
days.
Update the network and compare the crictal paths for the old network and the
updated network and thus calculate the remaining duration of the project. [16]



7. What are the factors e?ecting the selection of a truck for any construction work.
[16]


8. (a) De?ne and explain brie?y the following terms:
i. Height of building
ii. Service Road
iii. Building set back.
(b) Explain the objectives of building byelaws in large urban areas. [9+7]


II B.Tech II Semester Examinations,APRIL 2011
BUILDING PLANNING AND CONSTRUCTION MANAGEMENT
Civil Engineering
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks


1. List the factors a?ecting the design of residential buildings and explain in detail
the following: orientation, function and site topography. [16]


2. For the network shown in ?gure 4, assume that after working 14 days on the project,
the following conditions exist:-
(a) Activities 1-2 and 1-3 are complete as originally planned.
(b) Activity 3-4 is in process and will need 16 more days for completion.
(c) Activity 4-5 appears to present some problem and its now estimated time of
completion is 10 days.
(d) Activity 4-6 can be completed in 5 days instead of the originally planned 7
days.
Update the network and compare the crictal paths for the old network and the
updated network and thus calculate the remaining duration of the project. [16]


3. For the given ?gure 5network, calculate
(a) Earliest and latest activity time for each activity
(b) Total ?oat, free ?oat and independent ?oat.
(c) Determine the critical path. [16]



4. Write short notes on any two of the following:
(a) Di?erent types of rollers used for compaction
(b) Stabilization of soils with cement
(c) Geotechnical materials. [16]


5. Design an village panchayat o?ce for the following requirements and draw a line
diagram.
(a) Entrance and waiting room - 15 sq.m.
(b) Meeting hall to accommodate 40 people - 40 sq.m.
(c) V.P. President Chambers with attached toilet - 18 sq.m.
(d) V.P Secretary Chambers with attached toilet - 15 sqm.
(e) O?ce for 10 sta? - 100 sq.m.
(f) Toilet blocks - 2 Nos. of suitable size.
(g) Necessary provision to be made for corridors. [16]


6. (a) De?ne and explain brie?y the following terms:
i. Height of building
ii. Service Road
iii. Building set back.


(b) Explain the objectives of building byelaws in large urban areas. [9+7]
7. What are the factors e?ecting the selection of a truck for any construction work.
[16]


8. What are the factors e?ecting the output of a Drag line. [16]


II B.Tech II Semester Examinations,APRIL 2011
BUILDING PLANNING AND CONSTRUCTION MANAGEMENT
Civil Engineering


Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks


1. Design an village panchayat o?ce for the following requirements and draw a line
diagram.
(a) Entrance and waiting room - 15 sq.m.
(b) Meeting hall to accommodate 40 people - 40 sq.m.
(c) V.P. President Chambers with attached toilet - 18 sq.m.
(d) V.P Secretary Chambers with attached toilet - 15 sqm.
(e) O?ce for 10 sta? - 100 sq.m.
(f) Toilet blocks - 2 Nos. of suitable size.
(g) Necessary provision to be made for corridors. [16]


2. What are the factors e?ecting the output of a Drag line. [16]
3. Write short notes on any two of the following:
(a) Di?erent types of rollers used for compaction
(b) Stabilization of soils with cement
(c) Geotechnical materials. [16]


4. For the network shown in ?gure 4, assume that after working 14 days on the project,
the following conditions exist:-
(a) Activities 1-2 and 1-3 are complete as originally planned.
(b) Activity 3-4 is in process and will need 16 more days for completion.
(c) Activity 4-5 appears to present some problem and its now estimated time of
completion is 10 days.
(d) Activity 4-6 can be completed in 5 days instead of the originally planned 7
days.
Update the network and compare the crictal paths for the old network and the
updated network and thus calculate the remaining duration of the project. [16]


5. For the given ?gure 5network, calculate
(a) Earliest and latest activity time for each activity
(b) Total ?oat, free ?oat and independent ?oat.
(c) Determine the critical path. [16]


6. (a) De?ne and explain brie?y the following terms:
i. Height of building
ii. Service Road
iii. Building set back.


(b) Explain the objectives of building byelaws in large urban areas. [9+7]
7. List the factors a?ecting the design of residential buildings and explain in detail
the following: orientation, function and site topography. [16]
8. What are the factors e?ecting the selection of a truck for any construction work.
[16]

About Author:

I am Thomas Britto here to share my experiences in the civil engineering field to all my readers.Today many students are struggling to buy books at high prices. So I decided to start a blog and share my experience and knowledge with all my readers.


Let's Get Connected: Twitter | Facebook | Google Plus

No comments